Airport Public Notice

PUBLIC NOTICE FOR ST LANDRY PARISH AIRPORT

(December 2024)

The St. Landry Parish Government (Sponsor) as owner of St. Landry Parish Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 12.35% for FAA-funded contracts in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 12.35%, it will obtain 0.00% from race neutral participation and 12.35% through race conscious measures.

A teleconference will be held on December 19th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 12.35%

Federal Fiscal Year 2025: 13.63% – Obstruction Removal -18/36 (Construction) & Hangar

Federal Fiscal Year 2026: 6.77% – Hangar & Aircraft Parking Apron (North) – Pavement Rehab. (Design)

Federal Fiscal Year 2027: N/A – Aircraft Parking Apron (North) – Pavement Rehab. (Design) – Less than $250K No DBE Goal Required

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR LOS ALAMOS AIRPORT

(December 2024)

The Incorporated County of Los Alamos, NM (Sponsor) as owner of Los Alamos Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 5.40% for FAA-funded contracts in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 5.40%, it will obtain 0.00% from race neutral participation and 5.40% through race conscious measures.

A teleconference will be held on December 11th, 2024 from 8:00 AM Mountain Standard Time to 8:30 AM Mountain Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 5.40%

Federal Fiscal Year 2025: 1.54% – Relocate Taxiway F (Design)

Federal Fiscal Year 2026: 5.79% – Relocate Taxiway F (Construction)

Federal Fiscal Year 2027: N/A – No Federally Funded Project Anticipated

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR MCALESTER REGIONAL AIRPORT

(December 2024)

The City of McAlester, OK (Sponsor) as owner of McAlester Regional Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 2.90% for FAA-funded contracts in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 2.90%, it will obtain 0.00% from race neutral participation and 2.90% through race conscious measures.

A teleconference will be held on December 11th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 2.90%

Federal Fiscal Year 2025: 3.03% – Rehabilitate Taxiways, Rehabilitate Taxiway Lighting, and Rehabilitate Runway Visual Aids

Federal Fiscal Year 2026: N/A – No Federally Funded Project Anticipated

Federal Fiscal Year 2027: N/A – Rehabilitate Aprons & Taxilanes (Design) – Less than $250K No DBE Goal Required

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR HAYS REGIONAL AIRPORT

(December 2024)

The City of Hays, KS (Sponsor) as owner of Hays Regional Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 4.08% for FAA-funded contracts in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 4.08%, it will obtain 0.00% from race neutral participation and 4.08% through race conscious measures.

A teleconference will be held on December 11th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 4.08%

Federal Fiscal Year 2025: 4.48% – Reconstruct Runway 4-22 and Runway Turnarounds & Reconstruct Taxiway M Within Runway 4-22 Safety Area Limits

Federal Fiscal Year 2026: 0.00% – Acquire Snow Removal Equipment – Snow Broom

Federal Fiscal Year 2027: 4.10% – Expand Terminal Apron to the North

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR MINDEN AIRPORT

(November 2024)

The City of Minden, LA (Sponsor) as owner of Minden Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 12.28% for FAA-funded contracts/agreements in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 12.28%, it will obtain 0.00% from race neutral participation and 12.28% through race conscious measures.

A teleconference will be held on November 21st, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 12.28%

Federal Fiscal Year 2025: 12.28%: Base Bid: (1) 60×60 Box Hangar & (1) 60×80 Box Hangar & Add Alt: (1) 60×60 Box Hangar

Federal Fiscal Year 2026: N/A: No Anticipated Federally Funded Project

Federal Fiscal Year 2027: N/A: No Anticipated Federally Funded Project

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR MADERA MUNICIPAL AIRPORT

(October 2024)

The City of Madera, CA (Sponsor) as owner of Madera Municipal Airport hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 9.67% for FAA-funded contracts/agreements in fiscal years 2025 through 2027. The Sponsor estimates that in meeting the established overall goal of 9.67%, it will obtain 9.67% from race neutral participation and 0.00% through race conscious measures.

A teleconference will be held on October 30th, 2024 from 9:00 AM Pacific Standard Time to 9:30 AM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 9.67%

Federal Fiscal Year 2025: 10.01% 2025: Rehabilitate Apron A2 and Taxilane & Airport Layout Plan

Federal Fiscal Year 2026: N/A: F-150 Lightning Acquisition – Less than $250K No DBE Goal Required

Federal Fiscal Year 2027: 9.73%: Reconstruct Runway 12-30 & Rehab R/W Lighting (Design & Construction)

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR PARAGOULD MUNICIPAL AIRPORT – KIRK FIELD

(September 2024)

The City of Paragould, AR (Sponsor) as sponsor for the Paragould Municipal Airport – Kirk Field (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 3.77% for FAA-funded contracts/agreements in fiscal years 2022-2024. The Sponsor estimates that in meeting the established overall goal of 3.77%, it will obtain 0.00% from race neutral participation and 3.77% through race conscious measures.

A teleconference will be held on October 11th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2022-2024 Triennial DBE Goal: 3.77%

Federal Fiscal Year 2022: N/A – No Federally Funded Project

Federal Fiscal Year 2023: N/A – Install Runway Vertical/Visual Guidance System, Rehabilitate runway signage/markings, Rehabilitate taxiway signage/markings (Design): Less than $250K – No DBE goal required

Federal Fiscal Year 2024: 4.36% – Rehabilitate Runway and Taxiway (Construction)

The Sponsor has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Shelia Ragsdell – City of Paragould, Treasurer, 301 West Court Street, Paragould, Arkansas 72450, (870) 239-7510, shelia.ragsdell@paragouldcity.org

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, 817-609-6004, lspillers@dbeplans.com

PUBLIC NOTICE FOR CLINTON MUNICIPAL AIRPORT

(September 2024)

The City of Clinton, AR (Sponsor) as sponsor for the Clinton Municipal Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 6.86% for FAA-funded contracts/agreements in fiscal years 2022-2024. The City of Clinton, AR/Clinton Municipal Airport estimates that in meeting the established overall goal of 6.86%, it will obtain 0.00% from race neutral participation and 6.86% through race conscious measures.

A teleconference will be held on October 11th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2022-2024 Triennial DBE Goal: 6.86%

Federal Fiscal Year 2022: N/A – Construct Taxiway (Design): Less than $250K No DBE Goal Required

Federal Fiscal Year 2023: N/A – No Federally Funded Project

Federal Fiscal Year 2024: 8.29% – Construct Taxiway (Construction)

The Sponsor has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Trevor Dawson – Clinton Municipal Airport, Airport Manager, 544 Airport Road, Clinton, AR 72031, (501) 253-7703, trevor@dawsonaircraft.com

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, 817-609-6004, lspillers@dbeplans.com

PUBLIC NOTICE FOR CARROLL COUNTY AIRPORT

(September 2024)

Carroll County, AR (Sponsor) as sponsor for the Carroll County Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 4.90% for FAA-funded contracts/agreements in fiscal years 2022-2024. Carroll County, AR/Carroll County Airport estimates that in meeting the established overall goal of 4.90%, it will obtain 0.00% from race neutral participation and 4.90% through race conscious measures.

A teleconference will be held on October 11th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2022-2024 Triennial DBE Goal: 4.90%

Federal Fiscal Year 2022: N/A – No Federally Funded Project

Federal Fiscal Year 2023: N/A – Expand Apron (Design): Less than $250K No DBE Goal Required

Federal Fiscal Year 2024: 5.52% – Expand Apron (Construction)

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Mark Pepple – Carroll County Airport, Airport Manager, 518 County Road 308, Berryville, AR 72616, Telephone: (870) 423-8393, Email: ccac4m1@gmail.com

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR ESLER REGIONAL AIRPORT

(September 2024)

The Rapides Parish Police Jury (Sponsor) as sponsor for Esler Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 2.35% for FAA-funded contracts/agreements in fiscal years 2025 through 2027. The Rapides Parish Police Jury/Esler Regional Airport estimates that in meeting the established overall goal of 2.35%, it will obtain 0.00% from race neutral participation and 2.35% through race conscious measures.

A teleconference will be held on September 24th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 2.35%

Federal Fiscal Year 2025: 1.79% – Drainage Rehabilitation (Work Area 3) (Phase III – Construction) 1.49% & Airfield Lighting Rehabilitation (Phase I – Design) 5.57%

Federal Fiscal Year 2026: 2.89% – Airfield Lighting Rehabilitation (Phase II – Construction) 2.57%, Drainage Rehabilitation (Work Areas 5 & 7) (Phase IV – Design) 6.43%, & Drainage Rehabilitation (Work Areas 6) (Phase V – Design) 7.00%

Federal Fiscal Year 2027: 2.24% – Drainage Rehabilitation (Work Areas 5 & 7) (Phase VI – Construction) 1.09%, Taxiway A (East) Rehabilitation (Phase I – Design) 6.58%, & Drainage Rehabilitation (Work Areas 8 & 9) (Phase VII – Design) 6.24%

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR ENID WOODRING REGIONAL AIRPORT

(September 2024)

The City of Enid, OK (City) as sponsor for Enid Woodring Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 5.19% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The City of Enid, OK/Enid Woodring Regional Airport estimates that in meeting the established overall goal of 5.19%, it will obtain 0.00% from race neutral participation and 5.19% through race conscious measures.

A teleconference will be held on September 18th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Please note that the Airport is amending its previously approved FY 22-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress.

Specific project information is as follows:

Overall Fiscal Year 2022 – 2024 DBE Goal: 5.19%

Federal Fiscal Year 2022: 5.56% – Reconstruct Runway 13/31

Federal Fiscal Year 2023: 5.56% – Install Runway Lighting

Federal Fiscal Year 2024: 4.30% – Construct Taxilane

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR ALLEN PARISH AIRPORT

(August 2024)

The Allen Parish Police Jury as sponsor for the Allen Parish Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 5.15% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The Airport estimates that in meeting the established overall goal of 5.15%, it will obtain 0.00% from race neutral participation and 5.15% through race conscious measures.

A teleconference will be held on September 3rd, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2022 – 2024 DBE Goal: 5.15%

Federal Fiscal Year 2022: N/A – No Federally Funded Project

Federal Fiscal Year 2023: N/A – Install Perimeter Fencing not Required by 49 CFR 1542 (Less than $250K – No DBE Goal Required)

Federal Fiscal Year 2024: 5.82% – Perimeter Fencing & Access Gates

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR ADA REGIONAL AIRPORT

(August 2024)

The City of Ada, OK (City) as sponsor for Ada Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 5.73% for FAA-funded contracts/agreements in fiscal years 2025 through 2027. The City of Ada, OK/Ada Regional Airport estimates that in meeting the established overall goal of 5.73%, it will obtain 0.00% from race neutral participation and 5.73% through race conscious measures.

A teleconference will be held on September 3rd, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Overall Fiscal Year 2025 – 2027 DBE Goal: 5.73%

Federal Fiscal Year 2025: 7.82% – Construct New PAPIs, REILs & Rehabilitate ODALs (Design) & Construct Partial Parallel Taxiway B

Federal Fiscal Year 2026: 0.43% – Construct New REILs & Rehabilitate ODALs

Federal Fiscal Year 2027: 0.43% – Construct New PAPIs

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR HOLDENVILLE MUNICIPAL AIRPORT

(August 2024)

The City of Holdenville, OK (City) as sponsor for the Holdenville Municipal Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 2.91% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The City of Holdenville, OK/Holdenville Municipal Airport estimates that in meeting the established overall goal of 2.91%, it will obtain 0.00% from race neutral participation and 2.91% through race conscious measures. The proposed goal pertains to the federal fiscal years 2022 through 2024.

Please note, the Airport is updating its previously approved Fiscal Year 2022 – 2024 DBE goal to add a fiscal year 2024 project.  Projects from previous years are complete or in process and are included for informational purposes only.

A teleconference will be held on August 28th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2022 – 5.06% – Rehabilitate Parallel Taxiway and Apron

Federal Fiscal Year 2023 – No Federally Funded Project

Federal Fiscal Year 2024 – 1.23% – Perimeter Fence

For information pertaining to the DBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR CALIFORNIA REDWOOD COAST-HUMBOLDT COUNTY AIRPORT

(August 2024)

The County of Humboldt, CA as sponsor for California Redwood Coast-Humboldt County Airport (Airport) has established an Airport Concessions Disadvantaged Business Enterprise (ACDBE) Goal in accordance with 49 CFR Part 23. California Redwood Coast-Humboldt County Airport is a primary airport and has received federal funds authorized for airport development after January 1988 (authorized under Title 49 of the United States Code). The County of Humboldt, CA as sponsor for California Redwood Coast-Humboldt County Airport has signed airport grant assurances that it will comply with 49 CFR part 23.

The Airport has established a fiscal year 2025 annual ACDBE goal for car rental ACDBE participation of 0.02% of the total dollar amount of annual car rental concession gross expenditures. Potential car rental expenditures include: Petroleum bulk stations and terminals, Petroleum-Fuel Sales, Towing Services, Locksmiths, General Automotive Repair, Automotive Body, Paint, and Interior Repair and Maintenance, Automotive Glass Replacement Shops, Automotive Oil Change and Lubrication Shops, Car Washes, All other automotive repair and maintenance, Motor Vehicle Supplies and New Parts Merchant Wholesalers, Tire Dealers, Automotive Parts and Accessories Retailers, New Car Dealers, Used Car Dealers, and Insurance Agencies and Brokerages.

Furthermore, the Airport has established a fiscal year 2025 annual ACDBE goal for concessions other than car rentals of 0.19%. Anticipated non-car rental concession opportunities during the goal period consist of food, beverage, and parking.

The County and Airport will receive and consider public comments on the proposed goal until 5PM Pacific Daylight Time on September 27th, 2024. Please email these comments to lspillers@dbeplans.com of DBE Plans & Goals Preparation Services, LLC. A teleconference will be held on September 27th, 2024 from 11:00 AM to 11:30 AM Pacific Daylight Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581#.

The City/Airport has assigned the following individual as the Airport Concession DBE Liaison Officer (ACDBELO): Cathy Canepa – Department of Aviation, Senior Administrative Analyst, (707) 839-5401 (Option 5), ccanepa@co.humboldt.ca.us.

For information pertaining to the ACDBE Goal please contact: Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, (817) 609-6004, lspillers@dbeplans.com.

PUBLIC NOTICE FOR MOUNT PLEASANT REGIONAL AIRPORT

(July 2024)

The City of Mount Pleasant, TX (City) as sponsor for the Mount Pleasant Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 7.03% for FAA-funded contracts/agreements in fiscal year 2024. The City of Mount Pleasant, TX/Mount Pleasant Regional Airport estimates that in meeting the established overall goal of 7.03%, it will obtain 0.00% from race neutral participation and 7.03% through race conscious measures. The proposed goal pertains to the federal fiscal year 2024.

A teleconference will be held on August 7th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2024

DBE Goal: 7.03%

Project: Southwest Site Development and Drainage Improvements

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Paul Henderson – Mount Pleasant Regional Airport, Airport Manager – 501 Mike Hall Parkway, Mount Pleasant, TX 75455, Telephone: 903-575-4020, Email: phenderson@mpcity.org

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner – 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR ST LANDRY PARISH AIRPORT – AHART FIELD

(July 2024)

The St. Landry Parish Government as sponsor for the St. Landry Parish Airport-Ahart Field hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 7.18%

Perimeter Fencing (Phase 2)

Fiscal Year 2023: 6.94%

Rehabilitate Apron (Design)

Fiscal Year 2024: 7.83%

Runway 18-36 & Taxiway A Markings, Runway 18-36 Lighting Rehab, Taxiway C & Taxilane E Pavement Repairs, & Fencing

Overall Three-Year DBE Goal FY22-FY24: 7.65%

Please note prior year projects are complete or in progress.  The airport is amending its previously approved DBE goal to add a fiscal year 2024 project.

A teleconference will be held on August 9th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GUTHRIE/EDMOND REGIONAL AIRPORT

(July 2024)

The City of Guthrie, OK (City) as sponsor for the Guthrie/Edmond Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 3.39% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The City of Guthrie, OK/Guthrie/Edmond Regional Airport estimates that in meeting the established overall goal of 3.39%, it will obtain 0.00% from race neutral participation and 3.39% through race conscious measures. The proposed goal pertains to the federal fiscal years 2022 through 2024.

A teleconference will be held on July 31st, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2022 – No Federally Funded Project

Federal Fiscal Year 2023 – No Federally Funded Project

Federal Fiscal Year 2024 – 3.39% – Parallel Taxiway A Construction & Taxiway Edge Lighting, Signage, & Wind Cone Relocation

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Caden Young, Airport Manager – 520 Airport Road, Guthrie, OK 73044, Telephone: 405-282-2312, Email: cyoung@cityofguthrie.com

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner – 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR CARNEGIE MUNICIPAL AIRPORT

(July 2024)

The Town of Carnegie, OK (Town) as sponsor for the Carnegie Municipal Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 0.94% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The Town of Carnegie, OK/Carnegie Municipal Airport estimates that in meeting the established overall goal of 0.94%, it will obtain 0.00% from race neutral participation and 0.94% through race conscious measures. The proposed goal pertains to the federal fiscal years 2022 through 2024.

A teleconference will be held on July 31st, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2022 – No Federally Funded Project

Federal Fiscal Year 2023 – No Federally Funded Project

Federal Fiscal Year 2024 – 0.94% – Construct 4 – 50′ x 50′ Box Hangars

The Town/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Carla Nesbitt, Town Clerk – 11 East Main Street, Carnegie, OK 73015, Telephone: 580-654-1004, Email: cnesbitt@townofcarnegie.org

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner – 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR THOMAS MUNICIPAL AIRPORT

(July 2024)

The City of Thomas, OK (City) as sponsor for the Thomas Municipal Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 4.13% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The City of Thomas, OK/Thomas Municipal Airport estimates that in meeting the established overall goal of 4.13%, it will obtain 0.00% from race neutral participation and 4.13% through race conscious measures. The proposed goal pertains to the federal fiscal years 2022 through 2024.

A teleconference will be held on July 31st, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2022 – No Federally Funded Project

Federal Fiscal Year 2023 – No Federally Funded Project

Federal Fiscal Year 2024 – 4.13% – Rehabilitate Runway and Taxiway

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Brad Perkins, City of Thomas Airport Authority – Chairman, 620 East Hughes, Thomas, OK 73669, Telephone: 580- 603-2636, Email: bperkinspaint@pldi.net

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR FAIRVIEW MUNICIPAL AIRPORT

(July 2024)

The City of Fairview, OK (City) as sponsor for the Fairview Municipal Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 2.79% for FAA-funded contracts/agreements in fiscal years 2022 through 2024. The City of Fairview, OK/Fairview Municipal Airport estimates that in meeting the established overall goal of 2.79%, it will obtain 0.00% from race neutral participation and 2.79% through race conscious measures. The proposed goal pertains to the federal fiscal years 2022 through 2024.

A teleconference will be held on July 31st, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2022 – No Federally Funded Project

Federal Fiscal Year 2023 – Construct Taxiway (Less than $250K No DBE Goal Required)

Federal Fiscal Year 2024 – 2.94% – Construct Partial Parallel Taxiway Phase II

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Melinda Gould, City Clerk – 123 South Sixth Avenue, Fairview, OK 73737, Telephone: 580-227-4416, Email: clerk@fairviewok.org

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR THE OKLAHOMA DEPARTMENT OF AEROSPACE & AERONAUTICS

(July 2024)

The Oklahoma Department of Aerospace & Aeronautics (Department) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 3.31% for FAA-funded contracts/agreements.  The Oklahoma Department of Aerospace & Aeronautics estimates that in meeting the established overall goal of 3.31%, it will obtain 0.00% from race neutral participation and 3.31% through race conscious measures. The proposed goal pertains to the federal fiscal years 2025 through 2027.

A teleconference will be held on July 29th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2025: 3.06% – Preliminary Engineering Reports, Economic Impact Study Phase, and Drainage Study Phase 1

Federal Fiscal Year 2026: 3.54% – Preliminary Engineering Reports and Drainage Study Phase 2

Federal Fiscal Year 2024: 3.54% – Preliminary Engineering Reports

The Department has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Michelle Bouziden – Oklahoma Department of Aerospace & Aeronautics, Sr. Project & Grants Manager, 110 N. Robinson, Suite 200, Oklahoma City, OK 73102, Telephone: 405-604-6912, Email: Michelle.Bouziden@aerospace.ok.gov

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner, 113 Georgetown Court, Weatherford, TX 76087, Telephone: 817-609-6004, Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR PIERRE REGIONAL AIRPORT

(July 2024)

The City of Pierre, SD (City) as sponsor for the Pierre Regional Airport (Airport) hereby announces its proposed Disadvantaged Business Enterprise (DBE) participation goal of 0.58% for FAA-funded contracts/agreements in fiscal year 2024. The City of Pierre, SD/Pierre Regional Airport estimates that in meeting the established overall goal of 0.58%, it will obtain 0.00% from race neutral participation and 0.58% through race conscious measures. The proposed goal pertains to the federal fiscal year 2024.

A teleconference will be held on July 29th, 2024 from 9:00 AM Central Standard Time to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

Specific project information is as follows:

Federal Fiscal Year 2024: DBE Goal: 0.58% – Project: Runway 13/31 Rehabilitation

The City/Airport has assigned the following individual as the Airport’s Disadvantaged Business Enterprise Liaison Officer (DBELO):

Brian Cowles – Pierre Regional Airport, Airport Manager

3800 Airport Road, Suite 209

Pierre, SD 57501

Telephone: 605-773-7447

Email: brian.cowles@ci.pierre.sd.us

For information pertaining to the DBE Goal please contact:

Lauren Spillers – DBE Plans & Goals Preparation Services LLC, Owner

113 Georgetown Court

Weatherford, TX 76087

Telephone: 817-609-6004

Email: lspillers@dbeplans.com

PUBLIC NOTICE FOR WEATHERFORD STAFFORD AIRPORT

(June 2024)

The City of Weatherford, OK as sponsor for the Weatherford Stafford Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-funded projects in FY 2022 through FY 2024 is 0.61%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 0.61% – Construct 120′ x 100′ Hangar

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on July 5th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 5th, 2024, from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ALVA REGIONAL AIRPORT

(June 2024)

The City of Alva, OK as sponsor for the Alva Regional Airport is amending its previously approved FY22-24 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects to adjust the fiscal year 2024 project scope and goal.  The Airport hereby announces a proposed DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.61%.

Project specific information is located below: Please note that prior year projects are completed or currently in progress and are included informational purposes.

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.20%

Install LED Runway Lights & PAPIs: 1.06%

Apron Expansion (Design): 2.40%

Fiscal Year 2024: 5.15%

Base Bid: Overlay Taxiway: 6.06%

Add Alt 1: Taxiway Lighting: 0.31%

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on July 5, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 5, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR RUSSELL MUNICIPAL AIRPORT

(May 2024)

The City of Russell, KS as sponsor for the Russell Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA federally funded projects in FY 2022 through FY 2024 is 0.90%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 0.90%

Regrade Runway 17-35: 0.87%

Replace Runway 17-35 PAPIs, Rotating Beacon, and Supplemental Wind Cone: 0.94%

The County and Airport will receive and consider public comments on the proposed goal until 9:00 AM Central Standard Time on June 6th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 6th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ELKHART-MORTON COUNTY AIRPORT

(May 2024)

Morton County, KS as sponsor for the Elkhart-Morton County Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA federally funded projects in FY 2022 through FY 2024 is 4.30%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 4.30%

Rehab/Remark Runway 4-22 & Turnarounds: 3.95%

Remove Connecting Taxiway C: 6.66%

The County and Airport will receive and consider public comments on the proposed goal until 9:00 AM Central Standard Time on June 6th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 6th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ALTUS/QUARTZ MOUNTAIN REGIONAL AIRPORT

(May 2024)

The City of Altus, OK as sponsor for the Altus/Quartz Mountain Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA federally funded projects in FY 2022 through FY 2024 is 0.47%.

Project specific information is located below:

Fiscal Year 2022: N/A – Install Weather Reporting Equipment Less than $250K – No DBE Goal Required)

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 0.47% – Construct Fuel Farm

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on May 30th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on May 30th, 2024, from 9 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ROBERT S KERR AIRPORT

(May 2024)

The City of Poteau, OK as sponsor for the Robert S Kerr Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 1.13%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 1.13%

            Rehabilitate Runway 18-36: 1.16%

            Add Alt: Runway Safety Area Grading: 0.85%

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on May 28th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on May 28th, 2024, from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR SHREVEPORT REGIONAL AIRPORT

(May 2024)

The Shreveport Airport Authority as sponsor for the Shreveport Regional Airport hereby announces its proposed Fiscal Year 2024 DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2024: 5.23%

ATCT Relocation/Terminal Modernization (Design): 6.52%

Gate Capacity Expansion: 4.79%

A teleconference will be held on May 13th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ESLER REGIONAL AIRPORT

(April 2024)

The Rapides Parish Police Jury as sponsor for the Esler Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.10%

Rehab Terminal Building: 1.14%

Drainage Rehab (Work Area 3) (Phase II – Design): 0.69%

Fiscal Year 2024: 0.20% – Airport Master Plan Update, Layout Plan, & Inventory Map

Overall Three-Year DBE Goal FY22-FY24: 0.89%

Please note prior year projects are complete or in progress.  The airport is amending its previously approved DBE goal to add a fiscal year 2024 project.

If you would like to comment on the proposed DBE goal, please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR JONESVILLE AIRPORT

(April 2024)

The Town of Jonesville, LA as sponsor for the Jonesville Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 0.90% – Airport Master Plan, Layout Plan, & Inventory Map

Overall Three-Year DBE Goal FY22-FY24: 0.90%

A teleconference will be held on April 26th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR COFFEY COUNTY AIRPORT

(April 2024)

The County of Coffey, KS as sponsor for the Coffey County Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below.  Please note that the airport is amending its existing fiscal year 2022-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress and are only included for informational purposes.

Fiscal Year 2022: 8.03% – Reconstruct T-Hangar Taxilanes

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 8.11% – Rehab Taxiways

Overall Three-Year DBE Goal FY22-FY24: 8.06%

A teleconference will be held on April 22nd, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HUTCHINSON REGIONAL AIRPORT

(April 2024)

The City of Hutchinson, KS as sponsor for the Hutchinson Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 4.72%

Rehabilitate Taxiway B & E: 4.20%

Construct Apron Taxilane: 4.98%

Overall Three-Year DBE Goal FY22-FY24: 4.72%

A teleconference will be held on April 22nd, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HERINGTON REGIONAL AIRPORT

(April 2024)

The City of Herington, KS as sponsor for the Herington Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below.  Please note the airport is amending its existing fiscal year 2022-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress and are only included for informational purposes.

Fiscal Year 2022: 6.44% – Rehabilitate Aircraft Parking Apron and Connecting Taxiways

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 1.11%

Base Bid: Replace Runway 17-35 MIRL System: 1.20%

Add Alt 1: Replace Runway 17-35 PAPI Systems: 1.22%

Add Alt 2: Replace Runway 17-35 REIL Systems: 0.22%

Overall Three-Year DBE Goal FY22-FY24: 2.57%

A teleconference will be held on April 22nd, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR INDEPENDENCE MUNICIPAL AIRPORT

(April 2024)

The City of Independence, KS as sponsor for the Independence Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 2.97% – Rehabilitate Taxiways

Overall Three-Year DBE Goal FY22-FY24: 2.97%

A teleconference will be held on April 22th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SPRINGHILL AIRPORT

(March 2024)

The City of Springhill, LA as sponsor for the Springhill Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – Rehabilitate Runway/Rehabilitate Taxiway (Design) – Less than $250K No DBE Goal Required

Fiscal Year 2024: 9.50%

Base Bid: Runway Overlay: 8.70%

Additive Alternate No. 1 – Taxiway Overlay: 10.42%

Overall Three-Year DBE Goal FY22-FY24: 8.64%

A teleconference will be held on April 5th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR RUSTON REGIONAL AIRPORT

(March 2024)

The City of Ruston, LA as sponsor for the Ruston Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 8.35%

Base Bid: Hangar Access Taxilanes: 8.39%

Additive Alternate: Apron Expansion: 8.23%

Overall Three-Year DBE Goal FY22-FY24: 8.35%

A teleconference will be held on April 5th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR MINDEN AIRPORT

(March 2024)

The City of Minden, LA as sponsor for the Minden Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below.  Please note the airport is amending its existing fiscal year 2022-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress and are only included for informational purposes.

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 12.45% – Parallel Taxiway

Fiscal Year 2024: 3.67% – Perimeter Fencing

Overall Three-Year DBE Goal FY22-FY24: 11.37%

A teleconference will be held on April 5th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CHENNAULT INTERNATIONAL AIRPORT

(March 2024)

The Chennault International Airport Authority as sponsor for the Chennault International Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below.  Please note the airport is amending its existing fiscal year 2022-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress and are only included for informational purposes.

Fiscal Year 2022: N/A -No Federally Funded Project

Fiscal Year 2023: 6.06%

Rehabilitate South Apron Pavement – Phase 3: 7.89%

ACTC Rainscreen Installation: 1.48%

Fiscal Year 2024: 4.14%

          Taxiway Alpha North Rehabilitation: 6.11%

          Taxiway Golf Lighting: 1.12%

Overall Three-Year DBE Goal FY22-FY24: 5.10%

A teleconference will be held on April 5th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR VIVIAN AIRPORT

(March 2024)

The Town of Vivian, LA as sponsor for the Vivian Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below.  Please note the airport is amending its existing fiscal year 2022-24 DBE goal to add a fiscal year 2024 project.  Prior year projects are complete or in progress and are only included for informational purposes.

Fiscal Year 2022: 7.66% – Runway/Taxiway Improvements (Taxiway Turnarounds)

Fiscal Year 2023: No Federally Funded Project

Fiscal Year 2024: 6.76%

Base Bid: Runway 9-27 Rehabilitation: 6.58%

Alternate No. 1: Taxiway Turnaround Rehabilitation: 7.32%

Alternate No. 2: Apron Rehabilitation: 7.41%

Overall Three-Year DBE Goal FY22-FY24: 7.46%

A teleconference will be held on April 5th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR WILBURTON MUNICIPAL AIRPORT

(March 2024)

The City of Wilburton, OK as sponsor for the Wilburton Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA federally funded projects in FY 2022 through FY 2024 is 1.68%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 1.68% – Construct Hangar & Taxilane

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on March 25th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on March 25th, 2024, from 9 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR EMPORIA MUNICIPAL AIRPORT

(February 2024)

The City of Emporia, KS as sponsor for the Emporia Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA federally funded projects in FY 2022 through FY 2024 is 2.57%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 2.57% – Replace Runway 1-19 Parallel Taxiway Lighting System

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on March 8th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on March 8th, 2024 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR FREDERICK REGIONAL AIRPORT

(February 2024)

The City of Frederick, OK as sponsor for the Frederick Regional Airport is amending its previously approved FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects to add a fiscal year 2024 project.  Please note prior year projects are complete.  The proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects are indicated below:

Fiscal Year 2022: 0.78% – Rehabilitate Runway Lights and 4-Box PAPI’s

Fiscal Year 2023: N/A – No AIP Funded Project

Fiscal Year 2024: 1.31% – Construct Hangar

Overall Three-Year DBE Goal FY22-FY24: 1.12%

If you would like to comment on the proposed DBE goal or obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.  Furthermore, a teleconference will be held on March 8th, 2024, from 9 AM to 9:30AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to join the conference call, please dial into the teleconference at (415) 464-6800 with conference code 2180581#.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR PRAGUE MUNICIPAL AIRPORT

(February 2024)

The City of Prague, OK as sponsor for the Prague Municipal Airport is amending its previously approved FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects to add a fiscal year 2024 project.  Please note prior year projects are complete.  The proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects are indicated below:

Fiscal Year 2022: 1.03% – Rehabilitate Runway Lighting

Fiscal Year 2023: – No AIP Funded Project

Fiscal Year 2024: 1.58%

Base Bid: Construct Hangar 1 & 2: 2.03%

Add Alt 1: Construct Hangar 3: 0.94%

Add Alt 2: Construct Hangar 4: 0.95%

Overall Three-Year DBE Goal FY22-FY24: 1.40%

If you would like to comment on the proposed DBE goal or obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.  Furthermore, a teleconference will be held on March 8th, 2024, from 9 AM to 9:30AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to join the conference call, please dial into the teleconference at (415) 464-6800 with conference code 2180581#.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR BARTLESVILLE MUNICIPAL AIRPORT

(February 2024)

The City of Bartlesville, OK as sponsor for the Bartlesville Municipal Airport is amending its previously approved FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects to add a fiscal year 2024 project.  Please note prior year projects are complete.  The proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects are indicated below:

Fiscal Year 2022: 12.05% – Reconstruct and Expand Taxiway and Apron & Rehabilitate Taxilanes

Fiscal Year 2023: No AIP Funded Project

Fiscal Year 2024: 10.13% – Construct Taxilane

Overall Three-Year DBE Goal FY22-FY24: 10.48%

If you would like to comment on the proposed DBE goal or obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.  Furthermore, a teleconference will be held on March 8th, 2024, from 9 AM to 9:30AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to join the conference call, please dial into the teleconference at (415) 464-6800 with conference code 2180581#.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR FLAGSTAFF PULLIAM AIRPORT

(February 2024)

The City of Flagstaff, AZ as sponsor for Flagstaff Pulliam Airport has established an Airport Concessions Disadvantaged Business Enterprise (ACDBE) Goal in accordance with 49 CFR Part 23. The City of Flagstaff, AZ/Flagstaff Pulliam Airport anticipates receiving federal financial assistance from the Department of Transportation (DOT) for projects during the period of Federal Fiscal Years 2023 through 2025 and as a condition of receiving this assistance, must comply with 49 CFR Part 23.

The City of Flagstaff, AZ/Flagstaff Pulliam Airport has established an overall annual ACDBE goal for non-car rental ACDBE participation of 1.00% of the total dollar amount of annual non-car rental concession revenues. The Airport has also established a car rental ACDBE goal of 1.00% of annual car rental concession revenues.

If you would like to obtain information relevant to the goal setting process, please email these comments to lspillers@dbeplans.com of DBE Plans & Goals Preparation Services, LLC.

PUBLIC NOTICE FOR NATCHITOCHES REGIONAL AIRPORT

(February 2024)

The City of Natchitoches, LA as sponsor for the Natchitoches Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.99%.

Project specific information is located below:

Fiscal Year 2022: N/A – Seal Runway Pavement Surface/Pavement Joints Seal Taxiway Pavement & Surface/Pavement Joints Seal Apron Pavement – (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: 9.37% – Runway 17-35, Taxiways, and Apron Rehabilitation

Fiscal Year 2024: 3.20% – Fuel Facility Improvements: 3.66%, Hangar Door Replacement: 1.76%

Please note prior year projects are complete or in progress.  The airport is amending its previously approved DBE goal to add a fiscal year 2024 project.

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on February 26th, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 26th, 2024, from 9 AM to 9:30AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR VISALIA MUNICIPAL AIRPORT

(February 2024)

The City of Visalia, CA as sponsor for the Visalia Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 0.36%.

Project specific information is located below:

Fiscal Year 2022: N/A – Conduct or Update Miscellaneous Study (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 0.42% – Acquire New Sweeper: 0.09%, Reconstruct Taxiways A & B and Tiedown Apron, Mark T/W E Connector with No-Taxi Island (Design): 0.84%

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 15, 2024.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 15, 2024 from 2:00 PM to 2:30 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR FLAGSTAFF PULLIAM AIRPORT

(December 2023)

The City of Flagstaff, AZ as sponsor for the Flagstaff Pulliam Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 1.89%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.89% – Construct/Rehabilitate/Modify/Expand Snow Removal Equipment Building (Phase I)

Fiscal Year 2024: 1.89% – Construct/Rehabilitate/Modify/Expand Snow Removal Equipment Building (Phase II)

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Mountain Standard Time on December 18, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on December 18, 2023 from 2 PM to 2:30 PM Mountain Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ELK CITY REGIONAL BUSINESS AIRPORT

(November 2023)

The City of Elk City, OK as sponsor for the Elk City Regional Business Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 5.23%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – Construct Taxiway (Design) – Less than $250K No DBE Goal Required

Fiscal Year 2024: 5.76%

Construct Taxiway – 6.08%

Construct Terminal Building – 5.20%

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on November 30th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on November 30th, 2023 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR DURANT REGIONAL AIRPORT

(October 2023)

The City of Durant, OK as sponsor for the Durant Regional Airport – Eaker Field hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 0.51%.

Project specific information is located below:

Fiscal Year 2022: N/A – Conduct or Update Misc Study – Less than $250K No DBE Goal Required

Fiscal Year 2023: 0.92% – AWOS Replacement & Relocation

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on November 3rd, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on November 3rd, 2023, from 9 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR VICTORIA REGIONAL AIRPORT

(October 2023)

The County of Victoria, TX as sponsor for the Victoria Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.98%.

Project specific information is located below:

Fiscal Year 2022: 3.50% – Update Miscellaneous Study

Fiscal Year 2023: 0.00% – Purchase AARF Truck (No DBE vendors able to meet FAA specifications)

Fiscal Year 2024: 5.74% – Taxiway C Reconfiguration and Electrical Improvements

The County and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on October 16th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on October 16th, 2023 from 9:00 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR CHICKASHA MUNICIPAL AIRPORT

(September 2023)

The City of Chickasha, OK as sponsor for the Chickasha Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 0.81%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 0.81% – Construct T-Hangars

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on September 7th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on September 7th, 2023 from 9 AM to 10 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR BLACKWELL-TONKAWA MUNICIPAL AIRPORT

(September 2023)

The Cities of Blackwell & Tonkawa, OK acting by and through Blackwell-Tonkawa Airport Authority as sponsor for the Blackwell-Tonkawa Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.84%.

Project specific information is located below:

Fiscal Year 2022: N/A – Widen Runway (Design) – Less than $250K No DBE Goal Required

Fiscal Year 2023: 5.44%

            Base Bid: Rehabilitate Runway 17/35: 5.22%

            Add Alt 1: Widen Runway: 6.14%

            Add Alt 2: Remove Connector Taxiway: 1.99%

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on September 7th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on September 7th, 2023 from 9 AM to 10 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR OKMULGEE REGIONAL AIRPORT

(August 2023)

The City of Okmulgee, OK as sponsor for the Okmulgee Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.48%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 2.48% – Construct Hangars

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 9 AM Central Standard Time on August 31st, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on August 31st, 2023 from 9 AM to 10 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR STANTON COUNTY MUNICIPAL AIRPORT

(August 2023)

Stanton County, KS as sponsor for the Stanton County Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Reconstruct Taxiway, Reconstruct Taxiway Lighting (Design) – Less than $250K No DBE Goal Required

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 5.16% – Reconstruct Taxiway, Reconstruct Taxiway Lighting (Construction)

Overall Three-Year DBE Goal FY22-FY24: 4.93%

A teleconference will be held on August 31st, 2023 from 9AM to 10AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ESLER REGIONAL AIRPORT

(July 2023)

The Rapides Parish Police Jury as sponsor for the Esler Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.10%

Rehab Terminal Building: 1.14%

Drainage Rehab (Work Area 3) (Phase II – Design): 0.69%

Fiscal Year 2024: 7.09% – Drainage Rehab (Work Area 3) (Phase III – Construction)

Overall Three-Year DBE Goal FY22-FY24: 4.35%

A teleconference will be held on August 14th, 2023 from 8:30 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SLIDELL AIRPORT

(July 2023)

The City of Slidell, LA as sponsor for the Slidell Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 14.23%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 14.23% – Taxilane Reconstruction

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

The Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on July 19th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 19th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR HALLIBURTON FIELD AIRPORT

(July 2023)

The City of Duncan, OK as sponsor for the Halliburton Field Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.72%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 6.72%

Reconstruct T-Hangar Apron: 6.68%

Rehabilitate Terminal Apron: 6.76%

Construct Taxilane for Hangar Development Area: 6.74%

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on July 19th, 2023. Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 19th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR EL RENO REGIONAL AIRPORT

(July 2023)

The City of El Reno, OK as sponsor for the El Reno Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.48%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 8.02% – Rehabilitate Runway 17-35 Lighting and Pavement

Fiscal Year 2024: 1.18% – Construct Hangar

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on July 19th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 19th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR HOOKER MUNICIPAL AIRPORT

(July 2023)

The City of Hooker, OK as sponsor for the Hooker Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 1.01%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.01% – Install AvGas and Jet Fuel Self-Serve System

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on July 10th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 10th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR MOREHOUSE MEMORIAL AIRPORT

(June 2023)

The City of Bastrop, LA as sponsor for the Morehouse Memorial Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.5%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 6.5% – Runway & Taxiway Rehabilitation

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on July 5th, 2023. Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 5th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR DAVID JAY PERRY AIRPORT

(June 2023)

The Town of Goldsby, OK as sponsor for the David Jay Perry Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Please note the airport is amending its existing FY 2022-24 DBE goal to add a Fiscal Year 2024 project. Prior year projects are complete and are only included for informational purposes.

Fiscal Year 2022: 4.77% – Reconstruct Terminal Apron and Install Perimeter Fencing & Gates (Construction)

Fiscal Year 2023: N/A – No Project

Fiscal Year 2024: 2.16% – Replace T-Hangars

Overall Three-Year DBE Goal FY22-FY24: 3.61%

A teleconference will be held on June 30, 2023, from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR JENA AIRPORT

(June 2023)

The LaSalle Economic Development District as sponsor for the Jena Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.95%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 4.53% – Obstruction Removal

Fiscal Year 2024: N/A – Land Acquisition & New Hangar (Design): Less than $250k – No DBE Goal Required

The Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on June 30th, 2023. Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 30th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR SAYRE MUNICIPAL AIRPORT

(June 2023)

The City of Sayre, OK as sponsor for the Sayre Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 5.75%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 5.75% – Reconstruct Terminal & T-Hangar Apron

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on June 30th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 30th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR CUSHING MUNICIPAL AIRPORT

(June 2023)

The City of Cushing, OK as sponsor for the Cushing Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.48%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.88% – Entrance Gate & Perimeter Fencing (Design & Construction)

Fiscal Year 2024: 3.03% – New Parallel Taxiway (Design)

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on June 30th, 2023. Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 30th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR JONES MEMORIAL AIRPORT

(June 2023)

The City of Bristow, OK as sponsor for the Jones Memorial Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.95%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 4.95% – Construct Terminal Apron

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on June 30th, 2023. Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on June 30th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR CHENNAULT INTERNATIONAL AIRPORT

(May 2023)

The Chennault International Airport Authority as sponsor for the Chennault International Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A -No Federally Funded Project

Fiscal Year 2023: 7.89% -Rehabilitate South Apron Pavement – Phase 3

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 7.89%

A teleconference will be held on May 26th, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR AMELIA EARHART AIRPORT

(May 2023)

The City of Atchison, KS as sponsor for the Amelia Earhart Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 7.90% – Construct Runway (Design, Construction Services, & Closeout)

Fiscal Year 2023: 7.25% – Construct Runway 9-27 & Apron Connecting Taxiway; Install Runway & Taxiway Edge Lighting, Guidance Signs, & Navaids; Replace & Relocate AWOS & Clear Critical Area; Remove Portion of Runway 16-34

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 7.32%

A teleconference will be held on May 18th, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TRUTH OR CONSEQUENCES MUNICIPAL AIRPORT

(April 2023)

The City of Truth or Consequences, NM as sponsor for the Truth or Consequences Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 7.11% – Construct New Terminal Apron & Rehabilitate Terminal Apron

Fiscal Year 2024: N/A – Rehabilitate Runway Lighting System – Design (Less than $250K No DBE Goal Required)

Overall Three-Year DBE Goal FY22-FY24: 6.16%

If you would like to obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CHEROKEE MUNICIPAL AIRPORT

(April 2023)

The City of Cherokee, OK as sponsor for the Cherokee Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 5.80%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 5.80% – Construct Apron

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

If you would like to comment on the proposed DBE goal or obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.

PUBLIC NOTICE FOR HART AIRPORT

(April 2023)

The Town of Many, LA as sponsor for the Hart Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – Perimeter Fence – Design (Less than $250K No DBE Required)

Fiscal Year 2024: 7.19% – Perimeter Fence – Construction

Overall Three-Year DBE Goal FY22-FY24: 6.65%

A teleconference will be held on May 2nd, 2023, from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GEORGE R CARR MEMORIAL AIRFIELD

(April 2023)

The City of Bogalusa, LA as sponsor for the George R Carr Memorial Air Field hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: N/A – No Federally Funded Project

Fiscal Year 2024: 5.89% – Apron Rehabilitation – Phase IIA & Connector Taxiway Rehabilitation – Phase IIB

Overall Three-Year DBE Goal FY22-FY24: 5.89%

A teleconference will be held on May 2nd, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process. If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024. Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR DEQUINCY INDUSTRIAL AIRPARK

(April 2023)

The City of DeQuincy, LA as sponsor for the DeQuincy Industrial Airpark hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Improve Airport Drainage/Erosion Control (Design) – Less than $250K No DBE Goal Required

Fiscal Year 2023: 8.73% – Airfield Drainage Improvements & Airfield Pavement Sealcoat

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 7.78%

A teleconference will be held on April 25th, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR KELLY-DUMAS AIRPORT

(April 2023)

The West Carroll Parish Police Jury as sponsor for the Kelly-Dumas Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 4.35% – Runway 18-36 Widening

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 4.35%

A teleconference will be held on April 20th, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LIBERAL MID-AMERICA REGIONAL AIRPORT

(April 2023)

The City of Liberal, KS as sponsor for the Liberal Mid-America Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 3.31% – Update Airport Master Plan or Study & Rehabilitate GA & Commercial Aircraft Parking Apron

Fiscal Year 2023: 1.85% – Replace Runway 17-35 HIRL System & Guidance Signs, Construct Electrical Vault    Building & Install Control Systems, Replace Supplemental Wind Cone & Airport Rotating Beacon

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

Overall Three-Year DBE Goal FY22-FY24: 2.58%

If you would like to provide a comment on or obtain additional information relevant to the goal setting process, please email lspillers@dbeplans.com

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SYRACUSE-HAMILTON COUNTY MUNICIPAL AIRPORT

(March 2023)

The Syracuse-Hamilton County Airport Commission as sponsor for the Syracuse-Hamilton County Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA funded projects in FY 2022 through FY 2024 is 1.93%.

Project specific information is located below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 1.93% – Install New Jet-A Fuel Farm

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

The Commission and Airport will receive and consider public comments on the proposed goal until 8:30 AM Central Standard Time on April 10th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on April 10th, 2023, from 8:30 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR LEGROS MEMORIAL AIRPORT

(March 2023)

The Acadia Parish Police Jury as sponsor for the LeGros Memorial Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 10.35% – Airfield Drainage Improvements – Phase IIIB (Construction)

Fiscal Year 2024: 2.00% – Terminal Apron Expansion – Phase II (Construction)

Overall Three-Year DBE Goal FY22-FY24: 7.63%

A teleconference will be held on April 10th, 2023 from 8:30 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LOUISIANA REGIONAL AIRPORT

(March 2023)

The Ascension-St. James Airport & Transportation Authority as sponsor for the Louisiana Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 14.30% – Terminal Apron Reconstruction – Phase III (Construction)

Fiscal Year 2024: 13.72% – Terminal Apron Expansion – Phase II (Construction)

Overall Three-Year DBE Goal FY22-FY24: 14.08%

A teleconference will be held on April 10th, 2023 from 8:30 AM to 9:30 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR NATCHITOCHES REGIONAL AIRPORT

(March 2023)

The City of Natchitoches, LA as sponsor for the Natchitoches Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 8.84%.

Project specific information is located below:

Fiscal Year 2022: N/A – Seal Runway Pavement Surface/Pavement Joints Seal Taxiway Pavement & Surface/Pavement Joints Seal Apron Pavement – (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: 9.37% – Runway 17-35, Taxiways, and Apron Rehabilitation

Fiscal Year 2024: N/A – No Federally Funded Project Anticipated

The City and Airport will receive and consider public comments on the proposed goal until 11 AM Central Standard Time on March 31st, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on March 31st, 2023, from 11 AM to 12 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR BUFFALO MUNICIPAL AIRPORT

(March 2023)

The Town of Buffalo, OK as sponsor for the Buffalo Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No Federally Funded Project

Fiscal Year 2023: 7.96% – Crack Seal, Seal Coat, and Re-Mark Runway 17-35 & Crack Seal and Seal Coat Asphalt Portion of Apron

Fiscal Year 2024: N/A – No Anticipated Federally Funded Project

Overall Three-Year DBE Goal FY22-FY24: 7.96%

A teleconference will be held on March 23rd, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR MINDEN AIRPORT

(March 2023)

The City of Minden, LA as sponsor for the Minden Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 11.35%

Parallel Taxiway: 12.45%

Perimeter Fencing: 4.48%

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 11.35%

A teleconference will be held on March 23th, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TRACY MUNICIPAL AIRPORT

(March 2023)

The City of Tracy, CA as sponsor for the Tracy Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 5.91%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 8.56% – Entrance Road, Parking Lot, & Tee Hangar Taxiway – Slurry Seal, Crack Seal, Minor Pavement Patching

Fiscal Year 2024: 4.56% – Perimeter Fencing, Reconstruct Tee Hangar Taxilanes, & New Terminal Building (Design)

The City and Airport will receive and consider public comments on the proposed goal until 8 AM Pacific Standard Time on March 9, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on March 9, 2023 from 8 AM to 9 AM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ULYSSES AIRPORT

(March 2023)

Grant County, KS as sponsor for the Ulysses Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 3.55%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 3.55% – Replace Runway 17-35 MIRL System & PAPI System and Install Runway 13-35 REIL System

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The County and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on March 9th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on March 9th, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR BEAUREGARD REGIONAL AIRPORT

(March 2023)

The Beauregard Parish Airport District No. 1 as sponsor for the Beauregard Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Apron Rehabilitation – Phase I – Less than $250K – No DBE Goal Required

Fiscal Year 2023: 6.84% – Apron Rehabilitation – Phase II

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 6.35%

A teleconference will be held on March 9th, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LINCOLN REGIONAL AIRPORT/KARL HARDER FIELD

(February 2023)

The City of Lincoln, CA as sponsor for the Lincoln Regional Airport/Karl Harder Field hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.15%.

Project specific information is located below:

Fiscal Year 2022: N/A – Conduct or Update Miscellaneous Study (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: N/A – Install New Underground Oil-Water Separator (Less than $250K – No DBE Goal Required)

Fiscal Year 2024: 3.36%

  • Reconstruct RW 15-33, Regrade Shoulders and RW Safety Areas, Replace PAPI’s, Adjust FAA MALSR, Relocate Service Roads, Remove ROFA Terrain Penetration (Design)

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 27, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 27th, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR SEMINOLE MUNICIPAL AIRPORT

(February 2023)

The City of Seminole, OK as sponsor for the Seminole Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Parallel Taxiway (Design) – Less than $250K – No DBE Goal Required

Fiscal Year 2023: 5.88% – Parallel Taxiway (Construction) & Obstruction Survey & PAPI Rehab

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 5.50%

A teleconference will be held on February 28th, 2023 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ROGERS FIELD AIRPORT

(February 2023)

The County of Plumas, CA as sponsor for the Rogers Field Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.32%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 8.18%

Reseal Joints in Runway Pavement (Construction): 8.36%

Reseal Joints in Taxiway & Taxilane Pavement (Design): 3.01%

Fiscal Year 2024: 4.86%

Airport Layout Plan: 7.04%

Reseal Joints in Taxiway & Taxilane Pavement (Construction): 7.57%

Expand Existing Fuel Storage Tanks: 2.69%

The County and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 27th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 27th, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR NERVINO AIRPORT

(February 2023)

The County of Plumas, CA as sponsor for the Nervino Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 7.51%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 7.96%

Reseal Joints in Pavements – Runway (Construction): 8.51%

Reseal Joints in Pavements – Taxiways, Apron, & Taxilanes (Design): 3.07%

Fiscal Year 2024: 7.27%

Airport Layout Plan: 7.04%

Reseal Joints in Pavements – Taxiways, Apron, & Taxilanes (Construction): 8.50%

Replace Existing Pilots Lounge with New Pilots Lounge (Design): 3.08%

The County and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 27th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 27th, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR GANSNER FIELD AIRPORT

(February 2023)

The County of Plumas, CA as sponsor for the Gansner Field Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.88%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: N/A – New Beacon Tower & Beacon (Design) – Less than $250K – No DBE Goal Required

Fiscal Year 2024: 3.02%

Environmental Assessment – Perimeter Fencing: 1.11%

Airport Layout Plan: 7.04%

New Beacon Tower and Beacon (Construction): 1.82%

Reseal Airfield Pavement Joints in Taxiway A and Apron, Slurry Seal Aircraft Parking Apron (Design): 2.92%

The County and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 27th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 27th, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR MCALESTER REGIONAL AIRPORT

(February 2023)

The City of McAlester, OK as sponsor for the McAlester Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.28%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 1.48% – Construct Terminal Building

Fiscal Year 2024: 5.08% – Rehabilitate Taxiways

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 28th, 2023.  Please email these comments to lspillers@dbeplans.com. Furthermore, a teleconference will be held on February 28th, 2023, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ALVA REGIONAL AIRPORT

(February 2023)

The City of Alva, OK as sponsor for the Alva Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 3.01%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 1.20%

Install LED Runway Lights & PAPIs: 1.06%

Apron Expansion (Design): 2.40%

Fiscal Year 2024: 5.18% – Apron Expansion (Construction)

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 21, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 21, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR CLARENDON MUNICIPAL AIRPORT

(February 2023)

The City of Clarendon, AR as sponsor for the Clarendon Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.36%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 6.36% – Runway 18-36 Rehabilitation

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 21, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 21, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR STUTTGART MUNICIPAL AIRPORT

(February 2023)

The City of Stuttgart, AR as sponsor for the Stuttgart Municipal Airport/Carl Humphrey Field hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 6.69%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 6.69%

Runway 9-27 Repair, Reseal, Clean, & Re-Mark: 7.99%

Install New Beacon Tower & Beacon: 0.41%

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 21, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 21, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR LAKE VILLAGE MUNICIPAL AIRPORT

(February 2023)

The City of Lake Village, AR as sponsor for the Lake Village Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 8.47%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 8.47%

2 Bay Hangar & Hangar Access Taxiway: 8.60%

Entrance Road Rehabilitation: 8.16%

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 21, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 21, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR CARLISLE MUNICIPAL AIRPORT

(February 2023)

The City of Carlisle, AR as sponsor for the Carlisle Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.81%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 2.81% – Runway 9-27 Edge Light Rehabilitation

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 10 AM Central Standard Time on February 21, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 21, 2023 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR ROOKS COUNTY REGIONAL AIRPORT

(January 2023)

The Rooks County Airport Commission as sponsor for the Rooks County Regional Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 3.77%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 3.77% – Repair Pavement, Reseal Concrete Joints, & Remark Runway 18-36, Turnarounds, Apron, & Connecting Taxiway

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 4 PM Central Standard Time on February 9th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 9th, 2023 from 4 PM to 5 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR KINGMAN AIRPORT – CLYDE CESSNA FIELD

(January 2023)

The City of Kingman, KS as sponsor for the Kingman Airport – Clyde Cessna Field hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.16%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 4.16% – Repair Pavement, Reseal Concrete Joints, & Remark Runway 11-29, Apron, Connecting Taxiway, Partial Parallel Taxiway, & Hangar Taxilanes

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 4 PM Central Standard Time on February 9th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 9th, 2023 from 4 PM to 5 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR UNION PARISH AIRPORT

(January 2023)

The Union Parish Police Jury as sponsor for the Union Parish Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 7.54%.

Project specific information is located below:

Fiscal Year 2022: N/A – Remove RW 16/34 Approach Obstructions & Construct Hangar/Taxilane – Phase I (Design) – (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: 9.15% – Hangar Access Taxilane (Construction)

Fiscal Year 2024: 8.56% – 8-Unit T-Hangar (Construction)

The Police Jury and Airport will receive and consider public comments on the proposed goal until 4 PM Central Standard Time on February 9th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 9th, 2023 from 4 PM to 5 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR WELLINGTON MUNICIPAL AIRPORT

(January 2023)

The City of Wellington, KS as sponsor for the Wellington Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 3.03%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 3.03% – Repair Pavement, Reseal Concrete Joints, & Remark Runway 18-36, Parallel Taxiway, & Connecting Taxiways; Remark Concrete Portion of Aircraft Parking Apron

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

The City and Airport will receive and consider public comments on the proposed goal until 4 PM Central Standard Time on February 9th, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 9th, 2023 from 4 PM to 5 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR HEALDSBURG MUNICIPAL AIRPORT

(January 2023)

The City of Healdsburg, CA as sponsor for the Healdsburg Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.10%.

Project specific information is located below:

Fiscal Year 2022: N/A – No AIP Funded Project Requiring a DBE Goal

Fiscal Year 2023: 2.32% – Remove Taxiways A2, A3, A5, & Abandoned Pavement & Construct New Taxiway A2; Rehabilitate Taxiway Lighting and Signage

Fiscal Year 2024: N/A – Reconstruct North Apron (Design) – Less Than $250,000 (No DBE Required)

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on February 9, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on February 9, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR WATSONVILLE MUNICIPAL AIRPORT

(January 2023)

The City of Watsonville, CA as sponsor for the Watsonville Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 1.41%.

Project specific information is located below:

Fiscal Year 2022: N/A No AIP Funded Project

Fiscal Year 2023: 1.97%

Zero Emission Vehicle and Infrastructure Pilot Program: 0.00%

Upgrade Airfield Access Security & DBE/MBE Program and Goal Development; Program Update: 2.35%

Fiscal Year 2024: 0.59%

Environmental – Relocate Runway 27 Threshold and Reconfigure Apron Markings and Taxiway B & C to Meet Runway Visibility Zone Standards: 0.55%

Design South Tie-Downs: 0.71%

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 27, 2023.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 27, 2023 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR DEXTER B FLORENCE MEMORIAL AIRPORT

(November 2022)

The City of Arkadelphia, AR as sponsor for the Dexter B Florence Memorial Field hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – No AIP Funded Project

Fiscal Year 2023: 2.63% – Taxiway A Realignment & Taxiway D Removal & Apron Rehabilitation

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 2.63%

A teleconference will be held on November 18th, 2022 from 2 PM to 3 PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SHAWNEE REGIONAL AIRPORT

(October 2022)

The City of Shawnee, OK as sponsor for the Shawnee Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Improve Airport Drainage (Design), Less than $250K – No DBE Goal Required

Fiscal Year 2023: 5.63% – Improve Airport Drainage

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 5.11%

A teleconference will be held on October 27th, 2022, from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR WEST WOODWARD AIRPORT

(October 2022)

The City of Woodward, OK as sponsor for the West Woodward Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: N/A – Construct Taxiway – Design (Less than $250K – No DBE Goal Required)

Fiscal Year 2023: 4.52% – Construct Taxiway

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 3.92%

A teleconference will be held on October 18th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LAUGHLIN/BULLHEAD INTERNATIONAL AIRPORT

(September 2022)

The Mohave County Airport Authority as sponsor for Laughlin/Bullhead International Airport has established an Airport Concessions Disadvantaged Business Enterprise (ACDBE) Goal in accordance with 49 CFR Part 23. Laughlin/Bullhead International Airport anticipates receiving federal financial assistance from the Department of Transportation (DOT) for projects during the period of Federal Fiscal Years 2023 through 2025 and as a condition of receiving this assistance, must comply with 49 CFR Part 23.

Mohave County Airport Authority/Laughlin/Bullhead International Airport has established an overall annual ACDBE goal for non-car rental ACDBE participation of 1.00% of the total dollar amount of annual non-car rental concession revenues. The Airport has also established a car rental ACDBE goal of 1.00% of annual car rental concession revenues.

The Airport Authority and Airport will receive and consider public comments on the proposed goal until 5PM Mountain Standard Time on September 23rd, 2022.  Please email these comments to lspillers@dbeplans.com of DBE Plans & Goals Preparation Services, LLC.

A teleconference will be held on September 23, 2022 from 4PM to 5PM Mountain Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581#.

PUBLIC NOTICE FOR ADA REGIONAL AIRPORT

(August 2022)

The City of Ada, OK as sponsor for the Ada Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 6.53% – Construct Terminal Apron Phase II

Fiscal Year 2023: N/A – Rehabilitate Runway 18-36 (Design) Less than $250,000 No DBE Goal Required

Fiscal Year 2024: 7.66% – Rehabilitate Runway 18-36 (Construction)

Overall Three-Year DBE Goal FY22-FY24: 7.16%

A teleconference will be held on August 15th, 2022 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR BAXTER COUNTY AIRPORT

(July 2022)

Baxter County, AR as sponsor for the Baxter County Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 0.83% – Relocate Runway Preliminary Engineering

Fiscal Year 2023: Project Undetermined

Fiscal Year 2024: Project Undetermined

Overall Three-Year DBE Goal FY22-FY24: 0.83%

A teleconference will be held on August 2nd, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HOLDENVILLE MUNICIPAL AIRPORT

(July 2022)

The City of Holdenville, OK as sponsor for the Holdenville Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 5.06% – Rehabilitate Parallel Taxiway and Apron

Fiscal Year 2023: N/A – No AIP Funded Project Anticipated

Fiscal Year 2024: N/A – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 5.06%

A teleconference will be held on August 2nd, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CLINTON REGIONAL AIRPORT

(July 2022)

The City of Clinton, OK as sponsor for the Clinton Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 6.22%

Rehabilitate Runway 17/35

Rehabilitate Terminal Apron

Reconstruct T-Hangar Apron

Fiscal Year 2023: No AIP Funded Project Anticipated

Fiscal Year 2024: No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 6.22%

A teleconference will be held on July 13th, 2022 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR WINNSBORO MUNICIPAL AIRPORT

(July 2022)

The City of Winnsboro, LA as sponsor for the Winnsboro Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 3.54% – Runway Sealcoating & Re-Marking

Fiscal Year 2023: No AIP Funded Project Anticipated

Fiscal Year 2024: No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 3.54%

A teleconference will be held on July 26th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR EUNICE AIRPORT

(July 2022)

The City of Eunice, LA as sponsor for the Eunice Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 9.73% – Runway, Taxiway, & North Taxilane Rehabilitation

Fiscal Year 2023: No AIP Funded Project Anticipated

Fiscal Year 2024: No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 9.73%

A teleconference will be held on July 13th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR DOÑA ANA INTERNATIONAL JETPORT

(July 2022)

Doña Ana County, NM as sponsor for the Doña Ana County International Jetport Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 7.01% – East Hangar Expansion

Fiscal Year 2023: n/a – No Anticipated AIP Funded Project

Fiscal Year 2024: n/a – No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 7.01%

A teleconference will be held on July 13th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR MADILL MUNICIPAL AIRPORT

(June 2022)

The City of Madill, OK as sponsor for the Madill Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 4.65% – Construct New South Taxiway – Phase 2

Fiscal Year 2023: N/A – No Anticipated AIP Funded Project

Fiscal Year 2024: N/A – No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 4.65%

A teleconference will be held on June 23rd, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR PRAGUE MUNICIPAL AIRPORT

(May 2022)

The City of Prague, OK as sponsor for the Prague Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 1.03% – Rehabilitate Runway Lighting

Fiscal Year 2023: – No AIP Funded Project Anticipated

Fiscal Year 2024: – No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 1.03%

A teleconference will be held on May 5th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ENID WOODRING REGIONAL AIRPORT

(April 2022)

The City of Enid, OK as sponsor for the Enid Woodring Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 5.56%

Reconstruct Runway 13/31

Fiscal Year 2023: No AIP Funded Project Anticipated

Fiscal Year 2024: No AIP Funded Project Anticipated

Overall Three-Year DBE Goal FY22-FY24: 5.56%

A teleconference will be held on May 5th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR FREDERICK REGIONAL AIRPORT

(April 2022)

The City of Frederick, OK as sponsor for the Frederick Regional Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 0.78%

Rehabilitate Runway Lights and 4-Box PAPI’s

Fiscal Year 2023: N/A: No Anticipated AIP Funded Project

Fiscal Year 2024: N/A: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 0.78%

A teleconference will be held on April 27th, 2022 from 8AM to 9AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GRANT COUNTY AIRPORT

(April 2022)

Grant County, NM as sponsor for the Grant County Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 9.54%

Runway 8-26 Pavement Maintenance

Fiscal Year 2023: 9.48%

Aircraft Apron Pavement Maintenance & Drainage

Fiscal Year 2024: 6.90%

Environmental Assessment for Land Acquisition: 3.43%

Apron Expansion for Helicopter Parking: 8.98%

Overall Three-Year DBE Goal FY22-FY24: 8.72%

A teleconference will be held on April 27th, 2022 from 8AM to 9AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR AZTEC MUNICIPAL AIRPORT

(April 2022)

The City of Aztec, NM as sponsor for the Aztec Municipal Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 0.91%

Runway 8-26 Lighting & Visual Aids

Fiscal Year 2023: N/A – Apron Pavement Rehabilitation (Less than $250,000 – No DBE Goal Required)

Fiscal Year 2024: N/A – Reconstruct Airport Paving Apron South (Design) (Less than $250,000 – No DBE Goal Required)

Overall Three-Year DBE Goal FY22-FY24: 0.68%

A teleconference will be held on April 27th, 2022 from 8AM to 9AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR VIVIAN AIRPORT

(April 2022)

The Town of Vivian, LA as sponsor for the Vivian Airport hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: Runway/Taxiway Improvements (Taxiway Turnarounds):7.66%

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 7.66%

A teleconference will be held on April 18th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HERINGTON REGIONAL AIRPORT

(March 2022)

The City of Herington, KS as sponsor for the Herington Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 6.44%

Rehabilitate Aircraft Parking Apron and Connecting Taxiways

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 6.44%

A teleconference will be held on March 1st, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SMITH CENTER MUNICIPAL AIRPORT

(March 2022)

The City of Smith Center, KS as sponsor for the Smith Center Municipal Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 5.54%

Rehabilitate Runway 14-32

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 5.54%

A teleconference was held on March 1st, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to receive additional information pertaining to the airport’s FY22-24 DBE goal please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ST. LANDRY AIRPORT-AHART FIELD

(March 2022)

The St. Landry Parish Government as sponsor for the St. Landry Parish Airport-Ahart Field hereby announces its proposed Fiscal Year 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: Perimeter Fencing (Phase 2): 7.18%

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 7.18%

A teleconference will be held on April 12th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LIBERAL MID-AMERICA AIRPORT

(March 2022)

The City of Liberal, KS as sponsor for the Liberal Mid-America Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 3.31%

Update Airport Master Plan or Study

Rehabilitate GA & Commercial Aircraft Parking Apron

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 3.31%

If you would like to provide a comment on or obtain additional information relevant to the goal setting process, please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TRIBUNE MUNICIPAL AIRPORT

(March 2022)

The Greeley County Unified Board of Supervisors as sponsor for the Tribune Municipal Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 9.25%

Rehabilitate Aircraft Parking Apron & North Half of Runway 17-35 Parallel Taxiway

Add Alt: Reseal Portion of Runway 17-35 Concrete Joints & Remark Runway 17-35

Fiscal Year 2023:

No Anticipated AIP Funded Project

Fiscal Year 2024:

No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 9.25%

A teleconference will be held on February 17th, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ALTURAS MUNICIPAL AIRPORT

(January 2022)

The City of Alturas, CA as sponsor for the Alturas Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.49%.

Project specific information is located below:

Fiscal Year 2022: N/A (Cumulative Project Funding Less Than $250K – No DBE Goal Required)

  • Displace Runway 31 Threshold 200 ft. and Associated Airfield Marking and Lighting, REILs (Design)
  • Reseal Joints and Cracks in Airfield Pavements – R/W 13-31 and T/W B (Design)
  • Remove Existing FAA VASI and Install New FAA 4-box PAPI on Runway 31 (Design)
  • PAPI Design Review and Site Surveys

Fiscal Year 2023: 6.85%

  • Displace Runway 31 Threshold 200 ft. and Associated Airfield Marking and Lighting, REILs: 7.08%
  • Reseal Joints and Cracks in Airfield Pavements – R/W 13-31 and T/W B: 10.34%
  • Remove Existing FAA VASI and Install New FAA 4-box PAPI on Runway 31: 4.64%
  • PAPI Resident Engineering and Flight Check: 0.00%
  • Pavement Maintenance Management Plan: 5.86%

Fiscal Year 2024: N/A (Less than $250K – No DBE Goal Required)

  • Reseal Joints and Cracks in Runway 3-21

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR MADERA MUNICIPAL AIRPORT

(January 2022)

The City of Madera, CA as sponsor for the Madera Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 8.28%.

Project specific information is located below:

Fiscal Year 2022: Airfield Drainage Improvements: 9.84%

Fiscal Year 2023: Runway 12-30 – Mill and Fill (Design Only): Less than $250K – No DBE Goal Required

Fiscal Year 2024: No AIP Funded Project Anticipated

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR NEVADA COUNTY AIRPORT

(January 2022)

Nevada County, CA as sponsor for the Nevada County Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.21%.

Project specific information is located below:

Fiscal Year 2022: 4.10%

Rehabilitate Taxiway A & Ramp 2 (Construction): 4.10%

Fiscal Year 2023: 3.91%

Rehabilitate Ramps 1 & 5 (Construction) (Ph. 2(b)): 3.91%

Fiscal Year 2024: 4.63%

Reconstruct Ramp 4: 4.50%

Crack Repair Ramp 4 & Associated Access Road: 5.14%

The County and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.      

PUBLIC NOTICE FOR OROVILLE MUNICIPAL AIRPORT

(January 2022)

The City of Oroville, CA as sponsor for the Oroville Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 8.95%.

Project specific information is located below:

Fiscal Year 2022: 10.80%

Crack Seal Runway 2-20 and Associated Taxiways: 10.80%

Fiscal Year 2023: N/A

Reconstruct and Realign T/W S and Apron (Design): Less than $250K – No DBE Goal Required

Fiscal Year 2024: 9.10%

Reconstruct and Realign T/W S and Apron: 9.35%

Develop New Tee Hangar Taxilane Site (Design): 7.84%

The City and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com. Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR TULELAKE MUNICIPAL AIRPORT

(January 2022)

The County of Modoc, CA as sponsor for the Tulelake Municipal Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 4.15%.

Project specific information is located below:

Fiscal Year 2022: N/A (Cumulative Project Funding Less than $250K – No DBE Goal Required)

Pavement Maintenance Management Plan

Airport Layout Plan Narrative with Updated Airport Layout Plan Drawings and AGIS Survey

Fiscal Year 2023: 6.23%

Construction of 8-foot Habitat/Security Fence: 6.23%

Fiscal Year 2024: N/A (Less than $250K – No DBE Goal Required)

Reconstruct and Extend Taxiway A to Full Length of Runway 12-30 – Design

The County and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR MAMMOTH YOSEMITE AIRPORT

(January 2022)

The Town of Mammoth Lakes, CA (Mammoth Yosemite Airport):

The Town of Mammoth Lakes, CA as owner of Mammoth Yosemite Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 10.45%.

Project specific information is located below:

Fiscal Year 2022: 5.07%

8 bay ARFF/Snow Removal Facility, Utilities, Access Road, Apron (Design): 4.50%

Relocate AWOS: 5.88%

Fiscal Year 2023: 10.79%

8 bay ARFF/Snow Removal Fac., Utilities, Access Rd, Apron (Construction): 11.20%

Wildlife Security Fence: 7.73%

MAGVAR Change Runway Numbers to 10-28 including update signage: 12.90%

Environmental Assessments: 14.55%

Fiscal Year 2024: 12.63%

Rehabilitate Tee-Hangar Taxilanes: 12.63%

The Town and Airport will receive and consider public comments on the proposed goal until 2 PM Pacific Standard Time on January 28, 2022.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on January 28, 2022 from 2 PM to 3 PM Pacific Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR TAHLEQUAH MUNICIPAL AIRPORT

(January 2022)

The City of Tahlequah, OK as sponsor for the Tahlequah Municipal Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 10.32%

Rehabilitate Apron: 10.47%

Add Alt 1: Grade Runway 35 Runway Safety Area: 4.98%

Fiscal Year 2023: No Anticipated AIP Funded Project

Fiscal Year 2024: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 10.32%

If you would like to comment on the proposed DBE goal or obtain information relevant to the goal setting process, please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ESLER REGIONAL AIRPORT

(January 2022)

The Rapides Parish Policy Jury as sponsor for the Esler Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 6.34% – Runway Lighting Rehabilitation & Drainage Rehabilitation Safety Areas & Midfield (Design – Ph II)

Fiscal Year 2023: N/A – No Project Requiring a DBE Goal

Fiscal Year 2024: 10.54% – Drainage Rehabilitation Safety Areas & Midfield (Construction – Ph II) & Taxiway A East Rehabilitation (Design)

Overall Three-Year DBE Goal FY22-FY24: 8.08%

A teleconference will be held on January 13, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR COFFEY COUNTY AIRPORT

(January 2022)

The County of Coffey, KS as sponsor for the Coffey County Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 8.03%: Reconstruct T-Hangar Taxilanes

Fiscal Year 2023: N/A: No Anticipated AIP Funded Project

Fiscal Year 2024: N/A: No Anticipated AIP Funded Project

Overall Three-Year DBE Goal FY22-FY24: 8.03%

A teleconference will be held on January 20, 2022 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TUCUMCARI MUNICIPAL AIRPORT

(November 2021)

The City of Tucumcari, NM/Tucumcari Municipal Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport projects as indicated below:

Fiscal Year 2022: 7.41%: Runway 8-26 Reseal Maintenance (Design & Construction)

Fiscal Year 2023: n/a: No Project Receiving AIP Funds

Fiscal Year 2024: n/a: No Project Receiving AIP Funds

Overall Three-Year DBE Goal FY22-FY24: 7.41%

A teleconference will be held on December 2, 2021 from 10 AM to 11 AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR EAST TEXAS REGIONAL AIRPORT

(November 2021)

Gregg County, TX as sponsor for the East Texas Regional Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: No Project

Fiscal Year 2023: 6.78%: Structural Overlay of Runway 13/31 (Phase I)

Fiscal Year 2024: 7.18%: Structural Overlay & Reconstruction Runway 13/31 (Phase II)

Overall Three-Year DBE Goal FY22-FY24: 7.07%

A teleconference will be held on November 18, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR OKLAHOMA AERONAUTICS COMMISSION

(October 2021)

The Oklahoma Aeronautics Commission hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport projects as indicated below:

Fiscal Year 2022: 3.54%: Preliminary Engineering Reports

Fiscal Year 2023: 3.54%: Preliminary Engineering Reports

Fiscal Year 2024: 3.08%: Preliminary Engineering Reports & Statewide Economic Impact Study Update

Overall Three-Year DBE Goal FY22-FY24: 3.32%

A teleconference will be held on November 3, 2021 from 1PM to 2PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The commission’s DBE goal methodology is based on what the commission anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR DAVID JAY PERRY AIRPORT

(September 2021)

The Town of Goldsby, OK as sponsor for the David Jay Perry Airport hereby announces its proposed FY 2022-2024 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2022: 4.77%: Reconstruct Terminal Apron and Install Perimeter Fencing & Gates (Construction)

Fiscal Year 2023: No Project Confirmed

Fiscal Year 2024: No Project Confirmed

Overall Three-Year DBE Goal FY22-FY24: 4.77%

A teleconference will be held on September 28, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2022-2024.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

FY21 PUBLIC NOTICE FOR THOMAS P. STAFFORD AIRPORT

(August 2021)

The City of Weatherford, OK/ Thomas P. Stafford Airport hereby announces its FY 2021 DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2021: Construct Terminal Building: 1.40%

Potential Work Items Include:

236220  Commercial and Institutional Building Construction

238110  Poured Concrete Foundation and Structure Contractors

238120  Structural Steel and Precast Concrete Contractors

238130  Framing Contractors

238150  Glass and Glazing Contractors

238160  Roofing Contractors

238210  Electrical Contractors and Other Wiring Installation Contractors

238220  Plumbing, Heating, and Air-Conditioning Contractors

238350  Finish Carpentry Contractors

238910  Site Preparation Contractors

238990  All Other Specialty Trade Contractors

423320  Brick, Stone, and Related Construction Material Merchant Wholesalers

423330  Roofing, Siding, and Insulation Material Merchant Wholesalers

423610  Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers

423990  Other Miscellaneous Durable Goods Merchant Wholesalers

484220  Specialized Freight (except Used Goods) Trucking, Local

541350  Building Inspection Services

541611  Administrative Management and General Management Consulting Services

A teleconference will be held on August 6, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR LAUGHLIN/BULLHEAD INTERNATIONAL AIRPORT

(July 2021)

NOTICE TO THE PUBLIC:

FY 2022-2024 DISADVANTAGED BUSINESS ENTERPRISE (DBE) GOAL

July 19, 2021

The Mohave County Airport Authority and Laughlin/Bullhead International Airport:

The Mohave County Airport Authority as sponsor for the Laughlin/Bullhead International Airport hereby announces a proposed overall DBE goal for its Federal Aviation Administration (FAA) Disadvantaged Business Enterprise (DBE) Program, for the Airport. The proposed overall goal for FAA-AIP funded projects in FY 2022 through FY 2024 is 2.28%.

Project specific information is located below:

Fiscal Year 2022: 2.37%

Westside RSA Grading and Drainage Improvements

Fiscal Year 2023: 1.06%

Renovate Passenger Terminal Public Restrooms – Design and Construct

Parallel Taxiway A Rehabilitation – Design Only

Replace Taxiway “A” Signage (LED) – Design Only

Passenger Exit Lane Study – Terminal B to Terminal A

Acquire ARFF Foam Testing Equipment

Acquire Interactive Part 139 required Training System

Fiscal Year 2024: 2.47%

Parallel Taxiway A Rehabilitation – Construction

Replace Taxiway “A” Signage (LED) – Construction

The Airport Authority and Airport will receive and consider public comments on the proposed goal until 11AM Mountain Standard Time on July 30, 2021.  Please email these comments to lspillers@dbeplans.com.

Furthermore, a teleconference will be held on July 30, 2021 from 10AM to 11AM Mountain Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR EUFAULA MUNICIPAL AIRPORT

(June 2021)

The City of Eufaula, OK/Eufaula Municipal Airport hereby announces its FY 2021 DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2021: Rehabilitate Taxiway & Apron: 1.07%

Potential Work Items Include:

237310  Highway, Street, and Bridge Construction

238910  Site Preparation Contractors

423320  Brick, Stone, and Related Construction Material Merchant Wholesalers

423390  Other Construction Material Merchant Wholesalers

484220  Specialized Freight (except Used Goods) Trucking, Local

561730  Landscaping Services

541330  Engineering Services

541370  Surveying and Mapping (except Geophysical) Services

541380  Testing Laboratories

541611  Administrative Management and General Management Consulting Services

541810  Advertising Agencies

A teleconference will be held on June 14, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR BARTLESVILLE MUNICIPAL AIRPORT

(June 2021)

The City of Bartlesville, OK as sponsor for the Bartlesville Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funds

Fiscal Year 2020: No Project Receiving AIP Funds

Fiscal Year 2021: Reconstruct and Expand Taxiway and Apron & Rehabilitate Taxilanes: 12.05%

Overall Three-Year DBE Goal FY19-FY21: 12.05%

A teleconference will be held on June 8th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CARLISLE MUNICIPAL AIRPORT

(May 2021)

The City of Carlisle, AR as sponsor for the Carlisle Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Runway 9-27 Rehabilitation: 10.65%

Overall Three-Year DBE Goal FY19-FY21: 10.65%

A teleconference will be held on June 8th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TUCUMCARI MUNICIPAL AIRPORT

(May 2021)

The City of Tucumcari, NM as sponsor for the Tucumcari Municipal Airport hereby announces its proposed FY 2021 DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction project(s):

Fiscal Year 2021 Project: Runway 3-21 Pavement Rehabilitation: 7.88%

Potential Work Items Include:

237310 Highway, Street, and Bridge Construction

238910 Site Preparation Contractors

423320 Brick, Stone, and Related Construction Material Merchant Wholesalers

423390 Other Construction Material Merchant Wholesalers

484220 Specialized Freight (except Used Goods) Trucking, Local

541330 Engineering Services

541380 Testing Laboratories

541611 Administrative Management and General Management Consulting Services

541690 Other Scientific and Technical Consulting Services

A teleconference will be held on May 17, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

PUBLIC NOTICE FOR COFFEYVILLE MUNICIPAL AIRPORT

(April 2021)

The City of Coffeyville, KS as sponsor for the Coffeyville Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Replace Runway 17-35 Edge Lighting System (MIRL), Install New Runway 17-35 Holding Position Signs, Install New Runway 17 REIL System, & Replace Parallel and Connecting Taxiways Edge Lighting System (MITL): 1.82%

Overall Three-Year DBE Goal FY19-FY21: 1.82%

A teleconference will be held on April 2, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR DONA ANA INTERNATIONAL JETPORT

(April 2021)

Doña Ana County, NM as sponsor for the Doña Ana County International Jetport hereby announces its amended FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

The airport is amending its existing FY 2019-21 DBE goal to add a FY21 project.  Prior year projects are complete and are included for informational purposes.

Fiscal Year 2019: Reconstruct Runway – 10/28: 8.5%

Fiscal Year 2020: No AIP Funded Project

Fiscal Year 2021: Apron Sealcoat: 3.80%

Overall Three-Year DBE Goal FY19-FY21: 8.21%

If you would like to obtain information relevant to the goal setting process or comment on the proposed DBE goal, please email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR EMPORIA MUNICIPAL AIRPORT

(March 2021)

The City of Emporia, KS as sponsor for the Emporia Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Acquire Land for Approaches (No DBE Required)

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Base Bid: Replace Runway 1-19 Edge Lighting System and Guidance Signs & Replace Primary Wind Cone: 3.70%

Add Alternate: Replace Runway 1-19 Precision Approach Path Indicator (PAPI) Systems: 3.23%

Base Bid + Add Alternate: 3.55%

Overall Three-Year DBE Goal FY19-FY21: 1.99%

If you would like to obtain information relevant to the goal setting process or comment on the proposed DBE goal please email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SPRINGHILL AIRPORT

(March 2021)

The City of Springhill, LA as sponsor for the Springhill Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: 6 Unit T-Hangar: 10.30%

Overall Three-Year DBE Goal FY19-FY21: 10.30%

A teleconference will be held on March 31st, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR MARKSVILLE MUNICIPAL AIRPORT

(March 2021)

The Avoyelles Parish Airport Authority as sponsor for the Marksville Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Update Airport Master Plan Study (Less than $250K – No DBE Required)

Fiscal Year 2020: Reconstruct Apron (Phase I) (Less than $250K – No DBE Required)

Fiscal Year 2021: Reconstruct Apron (Phase II): 9.78%

Overall Three-Year DBE Goal FY19-FY21: 7.46%

A teleconference will be held on March 29th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR C E ‘RUSTY’ WILLIAMS AIRPORT

(March 2021)

The De Soto Parish Police Jury as sponsor for the C E ‘Rusty’ Williams Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: Phase 1: Rehabilitate Apron (Less than $250K – No DBE Required)

Fiscal Year 2021: Phase 2: Rehabilitate Apron: 9.84%

Overall Three-Year DBE Goal FY19-FY21: 8.87%

A teleconference will be held on March 26th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HART AIRPORT

(March 2021)

The Town of Many, LA as sponsor for the Hart Airport hereby announces its amended FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Please note the airport is amending its existing FY 2019-21 DBE goal to add a FY21 project.  Prior year projects are complete and are only included for informational purposes.

Fiscal Year 2019: No Project

Fiscal Year 2020: Apron and Mid-Field Connecting Taxiway Overlay: 7.17%

Fiscal Year 2021: Runway Reconstruction – South End: 10.51%

Overall Three-Year DBE Goal FY19-FY21: 9.45%

A teleconference will be held on March 24th, 2021 from 8AM to 9AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR INDEPENDENCE MUNICIPAL AIRPORT

(March 2021)

The City of Independence, KS as sponsor for the Independence Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Base Bid 1: Remove Taxiway B & Base Bid 2: Rehabilitate Taxiway D and Terminal Apron: 4.74%

Overall Three-Year DBE Goal FY19-FY21: 4.74%

A teleconference will be held on March 26th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ELKHART-MORTON COUNTY AIRPORT

(March 2021)

Morton County as sponsor for the Elkhart-Morton County Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Rehab & Remark Apron and Runway 17-35 Connecting Taxiway: 2.93%

Overall Three-Year DBE Goal FY19-FY21: 2.93%

A teleconference will be held on March 26th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ELK CITY REGIONAL BUSINESS AIRPORT

(March 2021)

The City of Elk City, OK as sponsor for the Elk City Regional Business Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: Rehabilitate Runway Lighting – 17/35 (Design) (< $250,000 No DBE Required)

Fiscal Year 2021: Install Runway 17-35 MIRL, Install Runway 17 & 35 2 Box LED PAPI’s Upgrade AWOS (Construction): 0.75%

Overall Three-Year DBE Goal FY19-FY21: 0.64%

If you would like to obtain information relevant to the goal setting process or comment on the proposed DBE goal, please email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR STROUD MUNICIPAL AIRPORT

(February 2021)

The City of Stroud, OK as sponsor for the Stroud Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: Seal Apron Pavement Surface/Pavement Joints (< $250,000 No DBE Required)

Fiscal Year 2021: Base Bid: Apron Crack Seal and Pavement Overlay & Add Alternate: Taxilane Crack Seal and Pavement Overlay: 6.18%

Overall Three-Year DBE Goal FY19-FY21: 4.97%

A teleconference will be held on March 8th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GEORGE R. CARR MEMORIAL AIR FIELD

(February 2021)

The City of Bogalusa, LA as sponsor for the George R. Carr Memorial Air Field hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: Rehabilitate Runway 18/36 – Phase I (Design) – Less than $250,000 No DBE goal required

Fiscal Year 2021: Rehabilitate Runway 18/36 – Phase II (Construction): 6.26%

Overall Three-Year DBE Goal FY19-FY21: 5.70%

A teleconference will be held on February 26th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TRIBUNE MUNICIPAL AIRPORT

(February 2021)

The Greeley County Unified Board of Supervisors as sponsor for the Tribune Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: No Project Receiving AIP Funding

Fiscal Year 2021: Replace Runway 17-35 Edge Lighting System, Relocate Runway 17-35 Holding Position Signs, and Replace Airport Rotating Beacon & Install Tower: 4.18%

Overall Three-Year DBE Goal FY19-FY21: 4.18%

A teleconference will be held on February 17th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

FY21 AMENDEMENT: PUBLIC NOTICE FOR HUTCHINSON REGIONAL AIRPORT

The City of Hutchinson, KS as sponsor for the Hutchinson Regional Airport hereby announces its amended FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Please note the airport is amending its existing FY 2019-21 DBE goal to add a FY21 project.  Prior year projects are complete and are only included for informational purposes.

Fiscal Year 2019: No Project

Fiscal Year 2020: Seal Coat and Remark Runway 13-31: 6.98%

Fiscal Year 2021: Seal Coat and Remark General Aviation Apron: 7.34%

Overall Three-Year DBE Goal FY19-FY21: 7.04%

A teleconference will be held on January 20th, 2021 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ADA REGIONAL AIRPORT

The City of Ada, OK as sponsor for the Ada Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Acquire Land for Approaches (No DBE Required)

Fiscal Year 2020: Construct Apron: Design (No DBE Required)

Fiscal Year 2021: Construct Apron: Construction: 7.95%

Overall Three-Year DBE Goal FY19-FY21: 6.02%

A teleconference will be held on January 6th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR NATCHITOCHES REGIONAL AIRPORT

The City of Natchitoches, LA as sponsor for the Natchitoches Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Acquire Land for Approaches (No DBE Required)

Fiscal Year 2020: 10.72%

Runway 7-25 & Taxiway B1 Reconstruction (Design) (No DBE Required) – CARES Act

Base Bid: Runway 7-25 & Taxiway B1 Reconstruction (Construction)

Additive Alternate: Partial Parallel Taxiway

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 9.63%

A teleconference will be held on September 16th, 2020 from 9AM to 10AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR PERRY MUNICIPAL AIRPORT

The City of Perry, OK as sponsor for the Perry Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Improve Airport Drainage, Improve Fuel Farm – Design (<$250,000 No DBE Required)

Fiscal Year 2020: Improve Fuel System: 0.48%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 0.44%

A teleconference will be held on July 10, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SEMINOLE MUNICIPAL AIRPORT

The City of Seminole, OK as sponsor for the Seminole Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Project 1 – Hangar Pavement Area & Project 2 – N. Hangar Relocation Design & Construction: 3.28%

Fiscal Year 2021: Construct Parallel Taxiway & North Hangar Apron: 6.61%

Overall Three-Year DBE Goal FY19-FY21: 4.23%

A teleconference will be held on June 3, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ULYSSES AIRPORT

Grant County, KS as sponsor for the Ulysses Airport hereby announce its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Update Airport Master Plan or Study: 5.40%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 5.40%

A teleconference will be held on June 3, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR OKMULGEE REGIONAL AIRPORT

The Okmulgee Municipal Authority as sponsor for the Okmulgee Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Rehabilitate Runway (Less than $250,000 No DBE Required)

Fiscal Year 2020: Reconstruct Taxilanes – Design (<$250,000 No DBE Required)

Fiscal Year 2021: Reconstruct Taxilanes – Construction: 7.69%

Overall Three-Year DBE Goal FY19-FY21: 5.92%

A teleconference will be held on May 27, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR TUCUMCARI MUNICIPAL AIRPORT

The City of Tucumcari, NM as sponsor for the Tucumcari Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Rehabilitate Runway & Taxiway (Design): No DBE Required <$250,000

Fiscal Year 2020: Reconstruct Taxiways: 6.86%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 6.50%

A teleconference will be held on May 15, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CLINTON REGIONAL AIRPORT

The City of Clinton, OK as sponsor for the Clinton Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Reconstruct T-Hangar Aprons – Design (Less than $250,000 No DBE Required)

Fiscal Year 2021: Reconstruct T-Hangar Aprons – Construction: 5.04%

Overall Three-Year DBE Goal FY19-FY21: 4.45%

A teleconference will be held on May 15, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR WATONGA REGIONAL AIRPORT

The City of Watonga, OK as sponsor for the Watonga Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Rehabilitate Runway 17/35 – Design Only (< $250,000 – No DBE Required)

Fiscal Year 2021: Rehabilitate Runway 17/35 – Construction: 5.18%

Overall Three-Year DBE Goal FY19-FY21: 4.64%

A teleconference will be held on May 8, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR THOMAS MUNICIPAL AIRPORT

The Thomas Airport Trust Authority as sponsor for the Thomas Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Construct Parallel Taxiway (Phase II) & Construct Apron: 3.56%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 3.56%

A teleconference will be held on May 1, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR PURCELL MUNICIPAL AIRPORT – STEVEN E. SHEPHARD FIELD

The City of Purcell, OK as sponsor for the Purcell Municipal Airport – Steven E. Shephard Field hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Reconstruct Terminal Apron – Design (<$250,000 no DBE Required)

Fiscal Year 2020: No Project

Fiscal Year 2021: Reconstruct Terminal Apron – Construction: 8.37%

Overall Three-Year DBE Goal FY19-FY21: 7.50%

A teleconference will be held on April 27, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GRANDFIELD MUNICIPAL AIRPORT

The City of Grandfield, OK as sponsor for the Grandfield Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Rehabilitate Runway Lighting, Rehabilitate Runway and Improve Airfield Drainage (Multi-Year Funding): 6.20%*

Fiscal Year 2020: No Project

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 6.20%

* Multi-Year Grant: The project (as referenced above) is part of a multi-year grant.  Federal funding will be made available in FY19 & FY20.  For the purpose of calculating the DBE goal, the airport will use the total grant amount and assign the DBE goal to the earliest funding year, in this case 2019.  No construction or bidding was performed in FY19 or will be performed prior to the DBE Goal being calculated and submitted to the FAA for approval.  The FY19 DBE goal is applicable to the project until all DOT-assisted funding is expended.

A teleconference will be held on April 27, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ALTUS/QUARTZ MOUNTAIN REGIONAL AIRPORT

The City of Altus, OK as sponsor for the Altus/Quartz Mountain Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Construct T-Hangar: 1.66%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 1.66%

A teleconference will be held on April 24, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SKIATOOK MUNICIPAL AIRPORT

The City of Skiatook, OK as sponsor for the Skiatook Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Install Taxiway Lighting (<$250,000 No DBE Required)

Fiscal Year 2020: Rehabilitate Runway 18/36: 5.92%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 5.41%

A teleconference will be held on April 22, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR JONES MEMORIAL AIRPORT

The City of Bristow, OK as sponsor for the Jones Memorial Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Reconstruct Taxiway Design (<$250,000 No DBE Required)

Fiscal Year 2020: Reconstruct Taxiway Construction: 3.51%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 3.25%

A teleconference will be held on April 17, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR GUTHRIE-EDMOND REGIONAL AIRPORT

The City of Guthrie, OK as sponsor for the Guthrie-Edmond Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Rehabilitate Apron (<$250,000 No DBE Required)

Fiscal Year 2020: Rehabilitate Terminal Apron: 6.91%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 6.06%

A teleconference will be held on April 9, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR DAVID JAY PERRY AIRPORT

The Town of Goldsby, OK as sponsor for the David Jay Perry Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Rehabilitate Runway 17/35: 7.61%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 7.61%

A teleconference will be held on April 9, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ST. LANDRY AIRPORT – AHART FIELD

The St. Landry Parish Government as sponsor for the St. Landry Parish Airport-Ahart Field hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Perimeter Fencing (Design & Phase 1): 7.38%

Fiscal Year 2021: Perimeter Fencing (Phase 2): 7.92%

Overall Three-Year DBE Goal FY19-FY21: 7.63%

A teleconference will be held on April 9th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR KIRK FIELD AIRPORT

The City of Paragould, AR as sponsor for the Kirk Field Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Construct Taxiway A Extension: 4.31%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 4.31%

A teleconference will be held on April 3rd, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SHAWNEE REGIONAL AIRPORT

The City of Shawnee, OK as sponsor for the Shawnee Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Rehabilitate Runway 17-35 & Parallel Taxiway: 6.22%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 6.22%

A teleconference will be held on April 3rd, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HATCH MUNICIPAL AIRPORT

The Village of Hatch, NM as sponsor for the Hatch Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Airport Pavement Rehabilitation: 3.86%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 3.86%

A teleconference will be held on April 3rd, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LE GROS MEMORIAL AIRPORT

The Acadia Parish Police Jury as sponsor for the Le Gros Memorial Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Airfield Drainage Improvements (Phase 2) (Runway Safety Areas) (Construction): 8.08%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 8.08%

A teleconference will be held on March 26th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SLIDELL AIRPORT

The City of Slidell, LA as sponsor for the Slidell Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: North Apron Overlay: 16.60%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 16.60%

A teleconference will be held on March 19th, 2020 from 2PM to 3PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR KELLY-DUMAS AIRPORT

The West Carroll Parish Airport Authority as sponsor for the Kelly-Dumas Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Construct Partial Parallel Taxiway with Connector (Phase II): 10.89%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 10.89%

A teleconference will be held on March 13th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HART AIRPORT

The Town of Many, LA as sponsor for the Hart Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Apron and Mid-Field Connecting Taxiway Overlay: 7.17%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 7.17%

A teleconference will be held on March 13th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR VICKSBURG-TALLULAH REGIONAL AIRPORT

The Vicksburg-Tallulah District Airport Board as sponsor for the Vicksburg-Tallulah Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No DBE Required (Federal Funding <$250,000)

Fiscal Year 2020: North End Taxilanes & 10-Unit T-Hangar (Construction): 11.04%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 8.80%

A teleconference will be held on March 13th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR HUTCHINSON REGIONAL AIRPORT

The City of Hutchinson, KS as sponsor for the Hutchinson Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Seal Coat and Remark Runway 13-31: 6.98%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 6.98%

A teleconference will be held on March 12th, 2020 from 2PM to 3PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR MINDEN AIRPORT

The City of Minden, LA as sponsor for the Minden Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Requiring a DBE Goal

Fiscal Year 2020: Rehabilitate Runway 01/19 and Lighting – Phase II (Construction): 11.33%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 11.33%

A teleconference will be held on March 5th, 2020 from 2PM to 3PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SYRACUSE-HAMILTON COUNTY MUNICIPAL AIRPORT

The Syracuse-Hamilton County Airport Commission as sponsor for the Syracuse-Hamilton County Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Receiving AIP Funding

Fiscal Year 2020: Construct Rectangular Hangars: 4.94%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 4.94%

A teleconference will be held on March 5th, 2020 from 2PM to 3PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR JENNINGS AIRPORT/JENNINGS, LA

The Airport District No. 1 of Jefferson Davis Parish as sponsor for the Jennings Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Seal Coat Runway 8-26 and Taxiways: 8.13%

Fiscal Year 2021: No Project

Overall Three-Year DBE Goal FY19-FY21: 8.13%

A teleconference will be held on March 5th, 2020 from 2PM to 3PM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR RUSTON REGIONAL AIRPORT/RUSTON, LA

The City of Ruston, LA as sponsor for the Ruston Regional Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Base Bid: Runway Extension with Turnaround; Add Alt: Taxiway Extension and End Connecting Taxiway: 9.78%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 9.78%

A teleconference will be held on February 24th, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal setting process.  If you would like to comment on the airport’s proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR RUSSELL MUNICIPAL AIRPORT/RUSSELL, KS

The City of Russell, KS as sponsor for the Russell Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project receiving AIP Funding

Fiscal Year 2020: BASE BID: Rehabilitate and Remark Runway 17-35 and Connecting Taxiways & ADD ALTERNATE: Rehabilitate and Remark Apron: 6.24%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 6.24%

A teleconference will be held on February 10, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR KINGMAN AIRPORT – CLYDE CESSNA FIELD/KINGMAN, KS

The City of Kingman, KS as sponsor for the Kingman Airport – Clyde Cessna Field hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Repair Pavement, Reseal Concrete Joints, and Remark Runway 18-36 and Turnarounds / Repair Pavement and Remark Runway Numerals for Runway 11-29: 5.40%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 5.40%

A teleconference will be held on January 24, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR SAYRE MUNICIPAL AIRPORT/SAYRE, OK

(December 2019)

The City of Sayre, OK as sponsor for the Sayre Municipal Airport hereby announces its proposed FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Requiring a DBE Goal

Fiscal Year 2020: South Apron Reconstruction: 5.47%

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 5.47%

A teleconference will be held on January 17, 2020 from 10AM to 11AM Central Standard Time for the purpose of consulting with stakeholders to obtain information relevant to the goal-setting process.  If you would like to comment on our proposed DBE goal, please dial into the teleconference at (415) 464-6800 with conference code 2180581# or email lspillers@dbeplans.com.

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR ARDMORE DOWNTOWN EXECUTIVE AIRPORT

(August 2019)

The City of Ardmore, OK as sponsor for the Ardmore Downtown Executive Airport hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Requiring a DBE Goal

Fiscal Year 2020: Rehab RW 17-35: 5.23%

Fiscal Year 2021: Rehab TW: 4.17%

Overall Three-Year DBE Goal FY19-FY21: 4.47%

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR TAHLEQUAH MUNICIPAL AIRPORT

(August 2019)

The City of Tahlequah as sponsor for the Tahlequah Municipal Airport hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project Requiring a DBE Goal

Fiscal Year 2020: Install Medium Intensity TW Lighting: 3.25%

Fiscal Year 2021: No Project Requiring a DBE Goal

Overall Three-Year DBE Goal FY19-FY21: 3.25%

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR CHENNAULT INTERNATIONAL AIRPORT

(July 2019)

The Chennault International Airport Authority as sponsor for the Chennault International Airport hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: TW Delta Realignment Engineering Study & Report (Preliminary and Final Design): 5.52%

Fiscal Year 2020: TW Delta Realignment Design: No DBE Required

Fiscal Year 2021: TW Delta Realignment Construction: 16.55%

Overall Three-Year DBE Goal FY19-FY21: 15.68%

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR LADOTD OFFICE OF MULTIMODAL COMMERCE (AVIATION DIVISION)

(June 2019)

The LADOTD – Office of Multimodal Commerce – Aviation Division (Baton Rouge, LA) hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: No Project

Fiscal Year 2020: Pavement Condition Index Study Update: 5.99%

Fiscal Year 2021: Obstruction Removal Program Study: 4.86%

Overall Three-Year DBE Goal FY19-FY21: 5.48%

The Agency’s DBE goal methodology is based on what the agency anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal. 

PUBLIC NOTICE FOR PRAGUE MUNICIPAL AIRPORT

(May 2019)

The City of Prague, OK/Prague Municipal Airport hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Construct Partial Parallel TW: 7.66% DBE Goal

Fiscal Year 2020: No Project Confirmed

Fiscal Year 2021: No Project Confirmed

Overall Three-Year DBE Goal FY19-FY21: 7.66%

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal.

PUBLIC NOTICE FOR WINNSBORO MUNICIPAL AIRPORT

(May 2019)

The City of Winnsboro, LA as sponsor for the Winnsboro Municipal Airport hereby announces its FY 2019-2021 Triennial DBE Goal for Disadvantaged Business Enterprise (DBE) airport construction projects as indicated below:

Fiscal Year 2019: Rehab TW A & Aprons 1, 2 & 4 and Reconstruction of Apron 3: 3.03%

Fiscal Year 2020: No Confirmed Project

Fiscal Year 2021: No Confirmed Project

Overall Three-Year DBE Goal FY19-FY21: 3.03%

The Airport’s DBE goal methodology is based on what the airport anticipates receiving for FY 2019-2021.  Significant changes to the projects as stated will require an amendment to the DBE goal.